{"version":"1.0","report":{"type":"case_study","label":"Case Study","publication_status":"published","evidence_policy":"Reported, derived and estimated claims are labelled separately; unavailable evidence is not represented as fact.","slug":"sir-case-storage-2026-08-12","title":"Should a Romanian EPC expand into utility-scale solar-plus-storage over the next 24 months?","description":"Recommendation: expand, but as a staged EPC capability build and partner-led execution platform, not as an open-ended developer balance-sheet bet. Romania’s evidence shows a very large renewable connection funnel, an emerging storage mandate, signed CfD-backed renewable volumes and accelerating system need for flexibility. The investable EPC opportunity is real; the undisciplined opportunity is dangerous.","market_period":"Focused market case study","published_at":"2026-08-11 21:31:47","path":"/case-studies/2026-08-11-should-a-romanian-epc-expand-into-utility-scale-solar-plus-storage-over-the-next-24-months","url":"https://solarindustry.ro/case-studies/2026-08-11-should-a-romanian-epc-expand-into-utility-scale-solar-plus-storage-over-the-next-24-months","citation":"Solar Industry Romania. “Should a Romanian EPC expand into utility-scale solar-plus-storage over the next 24 months?.” Case Study."}}